Risk Verification
Risk Verification: An Example
Was this helpful?
Thanks for your feedback!
There are several different ways to set up risk verification in Operational Risk. The method described here may be considered best practice for verification of critical control measures.
After critical risks have been identified and assessed for an organization, a list of base controls that protect against these critical risks can be identified for verification. The purpose of verification is to ensure that the base controls are fit for purpose, and that they are maintained and managed so that they will work as expected.
The image below shows how critical controls can be verified in Operational Risk.
This example has the following components: